Hinchinbrook Boat Ramp
PDF Print E-mail

Port Hinchinbrook

 

Superior's project focus was to provide conceptual designs and budget forecasts to assist with planning, then once confirmed, construction. This included pile delivery, barge establishment and installation of Superior's UMD system to allow for safe egress from vessels.

The pontoons installed are 40 metres long x 2 metres wide and this provides safe access to the water where marine stingers and crocodiles are risks when delivering and retrieving vessels from the boatramp.

 

 